G.M.S. AFFILIATED BUSINESSES:
GARRETT INDUSTRIAL SUPPLY
PIONEER CONVEYOR
GMS MINE REPAIR & MAINTENANCE
LOW PRO
Home
Products
Sales
Company Info
Career Opportunities
Contact us
Downloads
Pioneer Style
Catenary
Inline Series
Impact
Training Idlers
Slider Beds
LA
Cont. Big Hub Style
Sales Contacts
Request a Quote
Featured Products
Upcoming Tradeshows
Company Info
Manufacturing
Quality Assurance
Quality Assurance
Quality Control System
TS 16949 Quality system
    ▪Control Plan
    ▪Operator Inspection Logs
    ▪Visible Product Conformance Posters
100% in process inspection during manufacturing by each process technician in each assembly cell
Electronic copies of drawings with specifications are reviewed and accessible at every operator station
Quality Log books with lot traceability are required to be completed at every manufacturing cell
Idlers are stamped with a “born on date” for warrantee and traceability
First and Last Piece Inspection is conducted on every manufacturing run along with 10% in run testing
Random finished products are subjected to a load testing regimen to ensure product quality
Final Idler Inspection
Dimensional Inspections
Torque Testing
Run out Testing
Conveyor System Testing
Loaded Belt Simulation
Live Belt Simulation Testing - Pneumatic Loading System
60 ft Structure
Max Loading Capacity 2500 lbf
Loaded Belt Simulation
Live Belt Simulation Testing - Pneumatic Loading System
60 ft Structure
Max Loading Capacity 2500 lbf
Slurry Contamination Seal & Water Jet Seal Testing
Idler exposure to slurry water mixture
Test rotation: 500 RPMs for 100 hours.
Jet Seal Testing: Water is pumped through a jet at 46 GPM
The can of the idler is rotated at 500 RPMs
google fiber network